Vardy Then |
Vardy Now |
![]() |
![]() |
Albert Scearce and John Standifer consult photos and my "blueprints" to check
measurements on our second trip to Vardy. |
After much calculation the foundation is cut. Rear porch base will be added later. |
![]() |
![]() |
Measuring & laying out the front basement and first floor wall. |
Aligning the front and rear walls. Once this is correct, everything else
should fall into place. Material at left is for strength and was rock in the original school.
|
![]() |
![]() |
| Basement layout is done. I'll add trim and paint some of the hard-to-reach places before adding the first floor. The second floor and roof will be built separately and will lift off this section. | The main floor layout is done. The second floor and roof will lift off this section to allow access. |