Vardy School Project


Return to Home
Vardy Then
Vardy Now
Albert Scearce and John Standifer consult photos and my "blueprints" to check measurements on our second trip to Vardy.
After much calculation the foundation is cut. Rear porch base will be added later.
Measuring & laying out the front basement and first floor wall.
Aligning the front and rear walls. Once this is correct, everything else should fall into place. Material at left is for strength and was rock in the original school.
Basement layout is done. I'll add trim and paint some of the hard-to-reach places before adding the first floor. The second floor and roof will be built separately and will lift off this section. The main floor layout is done. The second floor and roof will lift off this section to allow access.